In brief

  • A line in the scoring table that contradicted itself has been put right. In the guide published in July 2026, „the diversification of the output of an establishment” earned 20 points, while „the diversification of the output of an existing establishment” earned 0 points, in the same column of the same table. The new version writes on the 0-point line „the diversification of the activity of an existing establishment”, which is exactly the wording of Annex no. 5 to Government Decision no. 486/2026. That is 20 points out of a possible 355, in a scheme where applications are examined in order of score until the budget of the session runs out.
  • The guide has shrunk from 132 to 88 pages, and the annexes have been renumbered. The list of eligible CAEN codes, the Romanian classification of economic activities, and the list of products with a trade deficit are no longer reprinted in the guide but have to be read in Annexes no. 1 and no. 2 to the decision. The application form has moved from Annex 3.1 to Annex 1.1, the business plan from Annex 4 to Annex 2, and the scoring criteria from Annex 10 to Annex 8. A file started on the old guide now points to annex numbers that no longer exist.
  • Financial leasing enters the guide, with a fixed date on which the whole aid hangs. Non-eligible technical installations, machinery and equipment may be taken under financial leasing, but the transfer of ownership has to take place by 30 November of the last year of the investment maintenance period. After that date, the financing agreement is revoked.
  • The money, the aid intensities and the submission mechanism are unchanged. A maximum budget of 5.313 billion lei, that is 1.05 billion euro, eligible expenditure of at least 50 million lei per project, intensities of between 30% and 70% depending on the county, and a per-company ceiling of between 24,750,000 euro and 57,750,000 euro. The guide contains no submission date: sessions are announced on the Ministry of Finance website at least 20 working days in advance and run for 30 working days.
Act: Order of the Minister of Finance no. 1.389/2026 on the approval of the Applicant’s Guide drawn up on the basis of Government Decision no. 486/2026 on stimulating investment for the manufacture of products with a trade deficit in the manufacturing industry, Revision 1
Published: Official Gazette of Romania, Part I, no. 885 of 22 October 2026, page 9, with the annex in no. 885 bis of 22 October 2026, pages 3-90
In force from: 22 October 2026, on the date of publication, because Article 4 of the order provides only for publication in the Official Gazette of Romania (Monitorul Oficial), with no later date

The Ministry of Finance has rewritten the guide to the 5.313 billion lei State aid scheme for the manufacturing industry, and the change with the heaviest consequences is not a new rule at all but a one-word correction in the table that decides who gets the money. The scheme pays grants or a tax credit to companies that invest in making products Romania imports far more of than it exports, and orders of this kind are what an investor actually reads: the decision says what is allowed, the guide says how to apply. Order no. 1.389/2026 approves Revision 1 of the guide and repeals Order no. 923/2026, which had approved Revision 0 on 29 July 2026. The difference in scale from the modest support available to small firms shows up at once: whereas in de minimis schemes the support stops at 300,000 euro per company, here a single undertaking can receive up to 57,750,000 euro.

The correction sits in the annex of criteria. The July version gave 20 points for „the setting-up of a new establishment” and „the diversification of the output of an establishment”, and two rows further down gave 0 points for „the diversification of the output of an existing establishment”. The same operation, two scores, in the same table, four rows apart. Annex no. 5 to Government Decision no. 486/2026, published in the Official Gazette of Romania, Part I, no. 509 of 22 June 2026, puts it differently: the 0-point line reads „the diversification of the activity of an existing establishment”, activity and not output, and the distinction makes sense, because the guide itself defines „the initial investment that creates a new economic activity” through the diversification of activity, not of output. The order of 12 October 2026 aligns the guide with the decision. The company that manufactures new products in an existing plant gets 20 points, and the one that diversifies its activity gets 0.

What it changes in practice

From 22 October 2026, the only guide in force for the scheme under Government Decision no. 486/2026 is Revision 1. Order no. 923/2026 is repealed on the same date, with no provision whatever about applications already prepared or submitted on the previous form.

For anyone building a file, the immediate consequence is administrative. The application for a financing agreement is submitted on the form in Annex 1.1, the instructions for completing it are in Annex 1.2, the business plan in Annex 2, the investment plan in Annex 3, the statement of the plan carried out in Annex 4, the summary table of payments in Annex 4.1, the comparative statement in Annex 5, the presentation of eligible costs in Annex 6, the turnover estimate in Annex 7, the scoring criteria in Annex 8 and the binding comfort letter in Annex 9. In Revision 0, the same documents bore the numbers 3.1, 3.2, 4, 5, 6, 6.1, 7, 8, 9, 10 and 11. An index of documents drawn up on the old guide points, after 22 October 2026, to annexes that no longer match, while the conformity condition requires explicitly that the application „comply with the form in Annex 1.1”.

The second consequence goes to substance. Non-eligible assets in the Technical installations, machinery and equipment category may now be acquired under financial leasing, which means a company no longer has to pay in full, from its own resources, for the plant that falls outside eligible expenditure. The conditions are strict: the leasing contract is concluded during the implementation period, its validity does not run beyond 30 November of the last year of the investment maintenance period, the assets are recorded in the company’s tangible fixed asset accounts and they have to be physically present at the investment site for the whole duration of the contract. If the transfer of ownership takes place after 30 November of that last year, the financing agreement is revoked, on the ground that the investment was not maintained for five years. By 30 June of the year following the end of the maintenance period, the company has to send in the documents proving that the transfer was made in time.

The third consequence touches the reporting at the end of the investment. A company that scored points for purchasing raw materials from the European Economic Area has to submit, by 30 June of the year following the end of the maintenance period, an audited report certifying that raw materials originating in the European Economic Area account for at least 15% or at least 35% of the total, depending on the score claimed. A definition is added here that changes the arithmetic: raw materials „purchased” means raw materials that have entered the company’s own assets, and materials used under toll manufacturing arrangements, where the client supplies the material, do not count. A company that processes raw material made available by its client cannot invoke the origin of that raw material for the 30 or 50 points.

Also new is the treatment of companies whose financial year differs from the calendar year: the return on turnover and the average turnover over the last four years of the maintenance period are established on the basis of the accounting reports closed on 31 December and filed with the National Agency for Fiscal Administration, under Article 27(6) of Law no. 82/1991, republished. The clarification appears three times in the text, at each reporting obligation to which it applies.

Finally, the eligibility condition that concerns shareholders has been spelled out. It is taken to be met if the company does not belong to members or shareholders who directly hold, or have held in the 2 years preceding registration of the application, at least 50% of the shares in another company that carries on, or has carried on, the activity for which the financing is sought. In the July 2026 form the condition existed but without this test, so it could be read more broadly or more narrowly, as the reader wished.

What has changed compared with the previous situation

Order no. 923/2026, signed on 21 July 2026 and published on 29 July 2026, approved Revision 0 of the guide, over 132 printed pages. Revision 1, signed on 12 October 2026, runs to 88. The difference of 44 pages comes from dropping two lists that were copies of the annexes to the decision: the list of eligible activity sectors, 210 CAEN codes, and the list of products with a trade deficit or surplus, split into six scoring groups, with the 2025 trade balance for each CPA2_2 code. Both are now read only in Annexes no. 1 and no. 2 to Government Decision no. 486/2026. The guide refers to them explicitly, in seven places where it previously said „Annex no. 1 to this Guide”.

The choice is sound as technique: a list reprinted in two different acts can fall out of step at the first amendment. The cost is that an investor who wants to find out which group his product falls into has to open the second act, and the guide does not tell him the number of the Gazette where it is to be found.

Apart from the scoring line and the lists taken out, the substantive changes are these.

The file has become fully electronic at the level of the conformity conditions too. Revision 0 asked for the certificat constatator, the company information certificate issued by the trade register, „either in the original or in electronic form”, for the financial statements „attached as a copy”, for the power of attorney „attached in the original”, for the identity document „as a copy”. Now it simply asks that the documents be „attached”, and that the investment plan be „dated and signed by the authorised person”. The conformity of the copies remains covered by the self-declaration in the application. Note, however, that for the start of works, Chapter III still asks for a notarised copy of the first contract or of the firm order, so the simplification does not go all the way.

The clarification about the technological flow is new and is repeated in three places: if a company applies for financing for two economic activities, that is two CAEN codes, it is enough that the technological flows of the two products include „a minimum of common technological stages”. In the previous form, the requirement that the two activities fall within the same technological flow existed without this threshold, so the evaluator and the applicant could read the same text with very different levels of strictness.

The explanation for the absence of a bonus for small and medium-sized enterprises has been cleared of a premise that led nowhere. Revision 0 said: schemes financed from European funds exclude large enterprises, therefore the scheme under Government Decision no. 486/2026 grants no bonuses topping up the intensity for small and medium-sized firms. The new version keeps only the reason that holds, complementarity with the European schemes, and drops the syllogism that did not close.

The terminology has been aligned: „the trade register” has become „the National Trade Register Office” in all the definitions concerning subsidiaries, branches and places of business.

What has not changed deserves saying just as firmly, because this is what people forget first. The maximum budget remains 5.313 billion lei, the equivalent of 1.05 billion euro at the rate of 5.06 lei to the euro set by Article 5(3) of the decision, with commitment appropriations for 2026-2032 and budget appropriations for 2027-2036. The average annual budget remains 759 million lei, that is 150 million euro, and the two figures close exactly: 759 million lei multiplied by the seven years 2026-2032 gives 5.313 billion lei. The minimum threshold of 50 million lei of eligible expenditure net of value added tax remains, and so do the intensities by county, from 30% in Arad and Timiș up to 70% in Galați, Prahova, Dolj and Gorj, with 35% and 45% for the eligible localities in Ilfov. The per-company ceiling remains between 24,750,000 euro and 57,750,000 euro, depending on the intensity. The submission mechanism is untouched: an announcement at least 20 working days in advance, a session of 30 working days, a list published within 5 working days of the close of the session, an analysis of 60 working days for each application, and, where scores are equal, a tie-break on the largest trade deficit of the product.

On 20 November 2026, the Government added a clarification to the session rule: under Government Decision no. 992/2026, the 30-working-day duration of a session under the GD no. 486/2026 scheme can be extended.

Advantages and disadvantages

What it improves

  • The 20-point contradiction in the scoring table was closed before any session had been scored under it, and the guide now says the same thing as Annex no. 5 to the decision.
  • Financial leasing for non-eligible installations and equipment frees up cash: the plant that falls outside eligible expenditure no longer has to be paid for in full from own resources during the implementation period.
  • The definition of „purchased” raw materials closes one route to taking 30 or 50 points without buying anything: raw material processed on a toll basis no longer counts.
  • The threshold of „a minimum of common technological stages” gives the applicant a test he can run himself before submitting, instead of a requirement left to judgement.
  • The conformity file no longer asks for originals and notarised copies, which fits the online submission through the ministry’s application.
  • The lists from the decision are no longer duplicated, so there is no longer any risk of the same list circulating in two different versions.

What remains a problem

  • The order repeals the previous guide on the date it enters into force and says not a word about applications prepared or submitted on the earlier form. A transitional provision of two lines would have cost nothing.
  • The renumbering of the annexes comes with no correspondence table, so every applicant who began a file in August or September 2026 has to work out for himself how the eleven old annexes map onto the nine new ones.
  • No submission date appears in the guide. The only information about the calendar is that the session is announced on the ministry’s website at least 20 working days in advance, so an investor cannot plan on the basis of the Official Gazette of Romania.
  • The Payment Guide, which Article 42 of the decision required at the same time as this one, still appears in the text in the future tense: „the manner of extension by up to 2 years will be set out in detail in the Payment Guide”. The extension of the tax credit period for companies that run a tax loss in the first two years hangs on a document that is not yet in the guide.
  • The example on page 39 of the guide invokes a „Group 7” that exists neither in Annex no. 2 to the decision nor in the guide’s own scoring table, where the groups stop at 6.
  • The application form still asks for the „return on turnover” expressed in lei, although the instructions define it as 100 multiplied by net profit over turnover, that is a percentage.
  • The per-company ceiling and the estimated number of beneficiaries do not sit together: Article 6 of the decision estimates up to 200 beneficiaries, yet 18 companies drawing the maximum in Galați would exhaust the entire budget of the scheme on their own.

Practical advice

  1. If you began your file on the July 2026 guide, check the annex numbers in your index of documents and in the business plan first. The application is submitted on Annex 1.1, not on Annex 3.1, and the conformity condition refers explicitly to the new number. The content of the forms has stayed largely the same, so the substantive work is not lost.
  2. Look up the group of your product in Annex no. 2 to Government Decision no. 486/2026, published in the Official Gazette of Romania, Part I, no. 509 of 22 June 2026. The list has left the guide. The group decides between 100 and 0 points, the heaviest weight in the whole table, and where there are several CPA2_2 codes a simple arithmetic mean is taken, so a product with no trade deficit pulls the score down.
  3. Do not start the works before registering the application. The guide allows a start after registration, but explicitly „at your own risk”, and a firm commitment entered into beforehand takes the investment outside the definition of an initial investment. Once the agreement is issued you have 6 months to start and to prove commitments of at least 3% of the total value of the investment.
  4. Work out whether it pays you to ask for less than the maximum. The criterion that rewards a reduced request gives 10 points for 10%, 20 for 20% and up to 50 points for a reduction of at least 50%. On an investment with 80 million lei of eligible expenditure in Suceava, the calculated maximum is 48 million lei, and a request for 36 million lei brings 20 points. The question to ask is whether those points lift you higher in the ranking than the money you give up costs you.
  5. If you intend to use financial leasing for non-eligible plant, write the date of 30 November of the last year of the maintenance period into the contract, not into your internal calendar. A transfer of ownership after that date leads to revocation of the agreement and recovery of the aid, not to a proportionate penalty.
  6. Subscribe to the announcements in the State aid section of the Ministry of Finance website. The 20 working days of notice plus the 30 working days of the session are all the time you have to put together the company information certificate, the financial statements, a business plan of at most 50 pages and the evidence of your source of financing.

Frequently asked questions

How much can a company actually receive from this scheme?
It depends on the county. The aid is calculated as a percentage of eligible expenditure, between 30% in Arad and Timiș and 70% in Galați, Prahova, Dolj and Gorj, and above that percentage an absolute ceiling per undertaking applies, from 24,750,000 euro to 57,750,000 euro. For large projects, meaning those with eligible expenditure above 50 million euro, the aid is calculated using the formula in the decision: the intensity multiplied by the sum of the first 55 million euro, half of the part between 55 and 110 million euro, and zero of the part above 110 million euro.
What is the smallest investment that gets me into the scheme?
The eligible expenditure of the project has to be at least 50 million lei net of value added tax, the equivalent of roughly 10 million euro at the rate of 5.06 lei to the euro used by the decision. Projects below that threshold are not eligible, and if the value drops below the threshold during implementation the agreement is revoked. Watch out for an easy confusion: the entry threshold is in lei, while the threshold at which a project becomes a „large investment project” is in euro.
When are applications submitted?
No date is fixed in the guide. The registration period is announced by the Ministry of Finance on its own website, in the State aid section, at least 20 working days before the session opens, and the session runs for 30 working days. The announcement states the opening date, the duration, the budget allocated to the session and the last day on which applications can be registered. Submission is online, through the ministry’s application.
How is the ranking between applicants drawn up?
Each application receives a score calculated solely on the information in the application, up to a maximum of 355 points: up to 20 for the type of investment, 5 for membership of an innovation cluster, up to 50 for the location of the investment, up to 100 for the group of the product with a trade deficit, up to 80 for the degree of automation, up to 50 for raw materials from the European Economic Area and up to 50 for requesting aid below the maximum. The list, ordered from highest to lowest, is published within 5 working days of the close of the session, and where scores are equal the company whose product has the largest trade deficit comes first.
Do I have to create a minimum number of jobs?
No. The guide imposes no hiring threshold and awards no points for jobs. The number of newly created jobs is presented in the business plan and reported in the audited report following completion of the investment, but it conditions neither eligibility nor the ranking. The performance obligations are different ones: a return on turnover above 2.5% as an average of the last four years of the maintenance period, and an average turnover of at least 80% of the figure estimated in the business plan.
What happens to a file prepared on the July 2026 guide?
The order repeals the previous guide from 22 October 2026 and provides nothing for files in progress, so the new form applies directly. In practice, the annex numbers in the index of documents and in the internal cross-references have to be redone, the scoring line for the type of investment has to be checked and, if you were counting on toll-processed raw materials for the European Economic Area criterion, the score has to be recalculated. The documents themselves, from the company information certificate to the investment plan, stay the same.

Errors and inconsistencies in the published text

  • The annex, Chapter VI, page 39 of the guide, the second example concerning the 70% of turnover: „Group 7” does not exist. The example describes a company that scored for a product in Group 1, one in Group 5, one in Group 6 and one in „Group 7”, and arrives at 30 points. Neither the scoring table in Annex 8 of the guide nor Annex no. 2 to Government Decision no. 486/2026, which is the sole source of the groups now that the list has been taken out of the guide, contains a Group 7: the groups stop at 6, and products that are not found in the list form a separate category, without a number, likewise scored 0. The number of terms matters, not only their score: the simple arithmetic mean of four products gives 30 points, while that of three products would give 40. A reader acting in good faith cannot reproduce the example, because he cannot place any product in the group invoked. The example is new, it did not exist in Revision 0.

Editorial analysis

The per-company ceiling in the table of intensities looks like a public policy decision, but it is not. For every county, the maximum level of the aid is exactly the intensity multiplied by 82.5 million euro: 40% gives 33,000,000, 50% gives 41,250,000, 60% gives 49,500,000, 70% gives 57,750,000. The figure of 82.5 million euro appears nowhere in the act, yet it falls out of the formula for large projects on its own: 55 million euro plus half of the 55 million between 55 and 110. Put differently, the ceiling „per undertaking” is the large-project formula evaluated at 110 million euro of eligible expenditure, with the part above 110 million euro entering at a coefficient of zero. An investment of 300 million euro in eligible expenditure receives exactly as much as one of 110 million. For an investor with a very large project, that is the most important piece of information in the whole guide, and it is written nowhere as such.

The second figure that cannot be seen by reading the act comes from combining the guide with Article 6 of the decision, which estimates „up to 200” beneficiaries. The maximum budget of 5.313 billion lei divided by 200 gives 26,565,000 lei per company, roughly 5.25 million euro. The lowest ceiling in the table, the one for Arad and Timiș, is 24,750,000 euro, that is 4.7 times the implicit average. At the other end, 18 companies drawing the maximum in Galați, Prahova, Dolj or Gorj, 57,750,000 euro each, around 292 million lei at the rate used by the decision, would exhaust the entire seven-year budget of the scheme on their own. The estimate of 200 beneficiaries and the per-company ceilings describe two different schemes, and the guide does not say how the budget is divided between sessions, so the first applicant with a high score in a well-funded session is playing by altogether different rules from the last.

The third thing visible only by comparison is the asymmetry of the deadlines. The applicant has a maximum of 10 working days from receipt of a request to complete the file, and overrunning it leads straight to a rejection letter. The administration has 60 working days of analysis for each application, 5 working days to publish the list and 20 working days of notice for the session. The same ratio shows up a level higher: Article 42 of the decision gave the Minister of Finance 60 working days from 22 June 2026, that is until 14 September 2026, to approve two documents by order, the Applicant’s Guide and the Payment Guide. The first was approved on 21 July 2026, within the deadline. The second is mentioned in Revision 1, signed on 12 October 2026, still in the future tense, as the place where the extension of the tax credit period by up to 2 years „will be set out in detail”. A company that chooses the tax credit instead of the grant is therefore signing up to a mechanism whose payment rules it has not yet been shown.

On substance, Revision 1 is a serious revision, not a cosmetic one: it repairs a scoring contradiction that could have moved 20 points in a ranking, removes duplicated lists, introduces financial leasing and closes the toll-processing loophole in the criterion on European raw materials. What it does reveal, though, is that the scoring table rewards automation with up to 80 points and jobs with 0, even though the declared objective of the scheme is regional development, and „the contribution to regional development” is defined in the guide itself through the taxes and duties arising from the investment and from the jobs created. The indicator that gives the objective its name is reported annually but never scored.

What should be changed

  1. Insert a transitional provision in the order. Two lines saying what happens to applications registered or under analysis on the date Order no. 923/2026 is repealed would remove the only real legal uncertainty of this revision, and at a future revision, during an open session, its absence will cost litigation.
  2. Correct „Group 7” in the example on page 39 and recalculate the example with the groups that do exist. If the intention was the category of products not found in the list, write it in the wording used in the scoring table, not as a group number.
  3. Put a correspondence table between the annexes of Revision 0 and those of Revision 1 at the front of the guide. It costs one page and spares every applicant who has begun a file the task of redoing the index by hand.
  4. Change the unit of the „return on turnover” field in the application form from lei to percentages. As it stands, the field asks in lei for an indicator the instructions define as a percentage ratio, and filling it in wrongly draws a request for information, which eats into the applicant’s 10 working days.
  5. Publish the Payment Guide or remove the references to it from the guide. For as long as the extension of the tax credit period by up to 2 years depends on an unapproved document, the tax credit option cannot be properly compared with the grant, and the tie-break criterion in the table is no help with that choice.
  6. Add a score for newly created jobs or, if the decision is that there should be none, take „the contribution to regional development” out of the annual reporting obligations. As things stand, the company reports for five years an indicator that brought it no points at selection and conditions nothing during the maintenance period.

Original text of the legal act

The text below is reproduced in Romanian, the official form of publication.

The full text, as published in the Official Gazette of Romania

Official Gazette of Romania no. 885 of 22 October 2026, page 9, with the annex in no. 885 bis of 22 October 2026, pages 3-90 16 pages PDF, 112 KB the act starts on page 9

Open the official PDFDownload the PDF

The other editions cited: nr. 885 bis/2026

The viewer is not shown on small screens. Use the buttons above to open or download the file.

This article is for informational purposes only and does not constitute legal advice. For specific situations, consult a licensed attorney or tax advisor.