In brief
- The Environment Fund covers up to 97% of the eligible costs of water supply, sewerage and stormwater drainage projects. The cap per project depends on the population of the administrative-territorial unit (UAT) at the 2021 census: 12 million lei below 5,000 inhabitants, 20 million between 5,000 and 10,000, and 30 million above 10,000, all VAT included.
- Projects are ranked on a 100-point grid, and the applicant’s own contribution brings up to 40 points. The maximum score for money is reached at a contribution of 8% or more; the rest comes from the detailed technical design (15 points), the building permit (20), a permit application filed on the basis of the DTAC (15) and, with a higher contribution, from bringing into compliance the agglomerations covered by Case C-668/25 (10).
- Communes, towns, municipalities, the sectors of Bucharest and their associations may apply, with one project per session. A county takes part only as leader of a single association. In the first session, the budget is split 30% for small UATs, 30% for medium ones and 40% for large ones; applications in sessions already launched stay under the old guide.
Published: Official Gazette of Romania (Monitorul Oficial), Part I, no. 980 of 26 November 2026, pages 2-32
In force from: 26 November 2026, the date of publication, as the order sets no other date
The Environment Fund Administration (AFM) has a new financing guide for local councils’ water and sewerage networks. Order no. 2.349/2026, signed on 20 November 2026 by the Minister of Environment, Waters and Forests and published on 26 November 2026, replaces in full the annex to Order no. 475/2024, the guide under which the sessions held so far were run. The programme adds to other sources of money for the same works, among them the “Anghel Saligny” Programme, whose financing contracts can be signed until 31 December 2027.
The guide sets the funding rate, the caps, who may apply and how projects are ranked. It does not set what the programme costs: the money comes from the annual budget of the Environment Fund, within the approved commitment and budget appropriations (Article 3(1)), and the amount of each session and its opening date are set by order of the AFM president. One session may be held each year, and if the money is not used up, another one may be opened.
The programme funds the creation, extension and modernisation of water supply, sewerage and stormwater drainage systems. Stormwater drainage has a condition of its own: it qualifies only within a project that also covers water or foul sewerage, and its length may not exceed the length of the water and sewerage networks in the same project (Article 7(8)). Projects that only build service connections are not eligible, and those extending water supply must also include the necessary sewerage and treatment, unless these already exist with sufficient capacity.
The order also has a transitional rule: applications filed in sessions launched before 26 November 2026 continue under the 2024 guide, in the version applicable on the date the respective session was launched (Article II).
What it changes in practice
The first effect concerns the money per project. The Environment Fund covers at most 97% of eligible costs, and the applicant contributes at least 3%. The caps, VAT included, depend on the UAT’s resident population at the 2021 census: 12,000,000 lei below 5,000 inhabitants, 20,000,000 lei between 5,000 and 10,000, and 30,000,000 lei above 10,000. Anything above the cap, as well as costs declared ineligible, is paid by the beneficiary from its own budget, and the approved amount cannot be increased after the contract is signed (Article 19(6)).
The second effect concerns the order in which the money is awarded. The AFM’s IT application calculates a score from what the applicant declares at registration and ranks the projects. The own contribution brings between 5 and 40 points, under the formula P = 5 + 7 × (C − 3), where C is the contribution percentage; from 8% upwards the maximum is awarded. The detailed technical design brings 15 points, a valid building permit 20, and proof that the permit application was registered on the basis of the DTAC, the technical documentation for the building permit, another 15. Projects that fit within the budget move on to assessment; the others form a reserve list valid for 36 months.
The third effect is a separate route for the localities covered by Case C-668/25, European Commission v Romania, the infringement proceedings on urban wastewater. An applicant that opts for the points linked to bringing such an agglomeration into compliance receives at most 92% funding and contributes at least 8%, and the contribution formula starts at 8% and reaches its maximum only at 13%. In return, it can earn 10 extra points, provided its contribution is at least 10%. The list of agglomerations is published on afm.ro.
The fourth effect is discipline in the application file. The statements in the financing application are checked against documents, and if the actual score turns out lower than the declared one, the project is rejected, with no recalculation (Article 14(11)). If it turns out higher, the declared score stands. The applicant has a total of 30 days from the first notification to answer all requests for clarification, and the contract must be signed electronically within 15 days of receipt, otherwise the applicant is deemed to have withdrawn.
The fifth effect shows during implementation. The project is carried out within 36 months of signing the contract, with a single extension of at most 12 months and cumulative suspensions of at most 24 months. The AFM may grant pre-financing of up to 30% of the contract value, in a single instalment, if the beneficiary holds firm contracts at least equal to the amount requested; the pre-financing must be accounted for within 180 days, and any unused part is repaid. The investment is monitored for another three years after the completion report.
What has changed compared with the previous situation
The order replaces the annex to Order no. 475/2024 with an entire new guide. For that reason, the text published on 26 November 2026 does not show what differs from the old rules, and the previous version of the guide is no longer available on the legislative portal, which already displays the new text. A point-by-point comparison cannot be made from the current act, so we do not say which rate or cap has gone up or down.
Some elements are certainly new, judging by their dates. The guide cites Directive (EU) 2024/3019 concerning urban wastewater treatment, adopted on 27 November 2024, after the publication of the March 2024 order. Likewise, Case C-668/25 bears the number of a 2025 case. The special route for the agglomerations covered by this case, with 92% funding, a minimum 8% contribution and the 10-point bonus, could not have existed in the guide approved in March 2024.
For applicants, the practical change is one of timing. Anyone who has already applied in a session launched before 26 November 2026 stays under the old rules until the file is closed. Anyone applying in the next session, which the AFM president opens by order, applies only the new guide, including the scoring grid and the caps by population category.
Advantages and disadvantages
What it improves
- Small communes have money set aside. In the first session, 30% of the budget goes to UATs with fewer than 5,000 inhabitants, and they do not compete directly with municipalities that can submit projects worth 30 million lei.
- The score is calculated automatically from verifiable criteria: the contribution rate and the existence of the detailed technical design, the building permit and the permit application. The ranking does not depend on assessors’ judgement.
- Pre-financing of up to 30% eases the pressure on local budgets at the start of works, and the programme money cannot be subject to garnishment (Article 19(7)).
- Rainwater networks are eligible, with a clear length limit, so streets getting new water and sewerage networks can also get rainwater drainage in the same project.
- Design, technical assistance and consultancy costs incurred before the contract can be reimbursed for approved projects, up to 6% of the basic investment.
What remains a problem
- The own contribution weighs 40 points out of 100. Each percentage point of contribution is worth 7 points, so UATs with money can outrank projects that are better prepared technically.
- The guide sets the minimum own contribution in several places, with different figures (3%, 5%, 8% and 10%), without saying which prevails.
- There is no deadline for the AFM’s assessment. The applicant has 30 days for all clarifications and 15 days to sign the contract, while the length of the evaluation is set by order of the AFM president.
- The programme budget appears nowhere in the order. Local councils cannot estimate how many projects will be funded per category until the session is announced.
- A project rejected after the check of its declared score gets no second chance: the score is not recalculated, even if the project would have stayed within the budget with a lower score.
Practical advice
- Check which category the UAT falls into based on the resident population in the final results of the 2021 census, published by the National Institute of Statistics. The cap moves from 12 to 20 million lei at the 5,000-inhabitant threshold and from 20 to 30 million at the 10,000-inhabitant threshold.
- Declare in the financing application only what you can prove with documents on the date of submission. A declared score higher than the one backed by the documents leads to rejection of the project, not to a lower score.
- Adopt the local council decision on participation and own contribution no later than the day of submission. It may be sent later, at the clarification stage, only if it was adopted by the submission date, and the percentage in the decision must match the one declared in the application.
- If the locality is on the list of agglomerations in Case C-668/25, do the maths before opting in: the special route lowers funding to 92%, and the 10 extra points are available only with an own contribution of at least 10%.
- Prepare answers to clarification requests in advance. The 30 days run from the first notification and are not extended by later AFM requests.
- Keep track of the 180 days from the transfer of the pre-financing: by then the reimbursement claim with supporting documents must be filed, and any unused amount is repaid, with interest in case of delay.
Frequently asked questions
How much can a commune with 3,000 inhabitants receive?
When does the application session open?
Can a county council apply?
What happens to an application filed in an earlier session?
Is stormwater drainage funded on its own?
How many projects can a local council submit?
How long does the reserve list last?
Errors and inconsistencies in the published text
- Minimum own contribution, Article 7(3) versus Article 13(7)(e), second paragraph (pages 4 and 8). Article 7(3) sets a minimum own contribution of 3%, and the formula in Article 13(7)(a)(1) awards points from 3% upwards. Article 13(7)(e), however, states that an applicant that does not opt for the points linked to Case C-668/25 receives 0 points under this criterion “iar contribuția proprie este de minimum 5%” (“and the own contribution is at least five per cent”). An application with a contribution between 3% and 4.99% is eligible under the first provision and below the minimum under the second, so the guide does not make it possible to determine whether such an application is rejected.
- Applicant opting for Case C-668/25, Article 7(2)-(3) versus Article 13(7)(a)(2) and (e) (pages 4 and 8). Article 7 ties the 92% funding and the 8% minimum contribution to the mere choice of this route, and the formula in point (a)(2) scores contributions from 8% upwards. Point (e), however, makes the 10 points conditional on a contribution of at least 10%, and the fallback rule in the same paragraph (0 points, minimum contribution 5%) covers only an applicant that does not opt in and an association that does not meet the territorial condition. For a UAT that opts in with a contribution between 8% and 9.99%, the text does not say whether it stays on the 92% ceiling, moves to the general 97% regime or whether the application is non-compliant.
- Deadline for appeals, Article 18(1) (page 9). The 30-day period runs “de la data comunicării rezultatelor conform art. 17 alin. (1)”, that is, from the date the results are communicated under the provision cited. Article 17(1) governs the publication of the lists on the AFM website; the communication of results to applicants, by e-mail, is in Article 17(2). If the two dates differ, two starting points for the period can be argued, and whether an appeal is filed in time depends on the choice.
Editorial analysis
The guide solves a real problem: it gives local councils readable rules for a source of money that does not depend on EU funds and ranks projects by criteria the application can calculate on its own. Splitting the budget across three population categories protects small communes, and the length condition for stormwater drainage prevents the programme from being used only for rainwater drainage.
The grid, however, has an imbalance that becomes visible only when the figures are set side by side. For a project that reaches the 12 million lei cap, a 3% contribution means about 371,000 lei, while the 8% contribution that earns the maximum score means about 1,043,000 lei. The difference of roughly 672,000 lei buys 35 points, more than the building permit (20) and the detailed technical design (15) combined. For a commune with fewer than 5,000 inhabitants, the budgetary sacrifice decides the ranking more than how far the project has been prepared.
The route for the agglomerations in Case C-668/25 contains a calculation trap. An applicant that opts in and contributes 10% gets 5 + 7 × 2 = 19 points for the contribution, plus the 10 bonus points, 29 in total. An applicant that does not opt in and contributes 8% gets 40. To match 40 points, the applicant on the special route needs a contribution of about 11.6%, and to reach 50 it needs 13%. On a 30 million lei project, the bonus for the localities Romania has to bring into compliance therefore costs more than 1.8 million lei extra compared with the 8% option, the difference between a contribution of about 4.48 and 2.61 million lei.
The population caps also affect associations. Two communes of 3,000 inhabitants each can receive 12 million each separately, 24 million lei in total; as an association, they add up to 6,000 inhabitants and have a single cap of 20 million. Three communes of 4,000 inhabitants each lose in the same way: 36 million separately, 30 million together. The guide encourages association through the applicant category but discourages it through the cap, and the balance of deadlines tilts the same unequal way: the applicant has fixed deadlines of 30 and 15 days, while the length of the AFM’s assessment is left to the president’s order.
What should be changed
- A single minimum contribution threshold, written in a single place. Article 13(7)(e) should be aligned with Article 7(3), with a clear rule for an applicant that opts in and does not reach 10%. Local councils would know before the vote which percentage to write in the council decision.
- A cap for associations calculated at least as the sum of the individual caps, up to a limit. Small communes would no longer lose money when they build a shared network together, which is usually the cheaper technical solution per inhabitant.
- A lower weight for the own contribution than for technical preparation. A grid with at most 25 points for money and the rest for permits and technical design would bring forward the projects that can start works immediately.
- A deadline for the AFM’s assessment, written into the guide. A deadline of 60 or 90 days from the close of the session would allow local councils to plan their local budget and works contracts.
- An express rule on when the appeal period starts. The reference in Article 18(1) should point to the e-mail communication in Article 17(2), so that the 30-day period runs from a date the applicant can prove.
- The budget of the first session announced together with the guide. With the amount known, each category of UAT could estimate how many projects at the cap will be funded and whether the cost of a detailed technical design is worth it before applying.
Original text of the legal act
The text below is reproduced in Romanian, the official form of publication.
The full text, as published in the Official Gazette of Romania
Official Gazette of Romania no. 980 of 26 November 2026, pages 2-32 32 pages PDF, 162 KB the act starts on page 2
Open the official PDFDownload the PDF