In brief

  • From 1 October 2026, the European list of selected cross-border projects in the field of renewable energy holds 15 projects, and Romania appears on it twice: the Turnu Măgurele – Nikopol hydraulic structures complex, together with Bulgaria, and a wind integration project for grid decarbonisation, together with Ukraine.
  • Only one of the two is new. The project with Bulgaria has been on the list since 21 October 2024, that is for 710 days, and the regulation does not change it at all. The project with Ukraine comes in now, among the three additions, while a Spanish-Dutch project drops out.
  • The status brings no money, it brings the right to ask for money. The reference envelope for this category is 15 % of the EUR 5,838,000,000 of the energy sector of the Connecting Europe Facility, that is EUR 875.7 million for every project in the Union, and the applicant must also prove that the project would not go ahead without the grant.
Act: Commission Delegated Regulation (EU) 2026/1470
Published: Official Journal of the European Union, L series, 2026/1470 of 11 September 2026
In force from: 1 October 2026
Applies from: entry into force, directly in all Member States, with no national implementing measures

A table of 15 rows decides who may ask for European money for green energy built together with the neighbours, and Romania shows up in it twice. Commission Delegated Regulation (EU) 2026/1470, published in the Official Journal of the European Union, L series, 2026/1470 of 11 September 2026, replaces Article 1 of Delegated Regulation (EU) 2022/2202 and rewrites the whole list of selected cross-border projects in the field of renewable energy. The new list, in force from 1 October 2026, takes in a Romanian-Ukrainian wind integration project, while the hydraulic complex at Turnu Măgurele stays exactly where it was. On the hydropower side, the domestic legal setting moved in the summer of 2026, when hydropower developments started before 2007 were given a way out of protected natural areas.

The two Romanian entries read exactly as the regulation writes them. The first carries project number 2023-6 and the name „TMNHSA – Turnu Magurele – Nikopol Hydraulic Structures Assembly”, with Natsionalna Elektricheska Kompania EAD, Bulgaria’s national electricity company, and S.P.E.E.H. Hidroelectrica S.A. as developers, and Bulgaria and Romania as participating countries. The second carries number 2025-2 and the name „Wind Integration for Network Decarbonization – WIND”, the developer entered in the table is DTEK, and the participating countries are Romania and Ukraine. Beyond that, the regulation says nothing: no installed capacity, no stage of works, no cost, no funding figure. The table has four columns, project number, project name, project developers and participating countries, and it stops there for all 15 positions.

The word that deserves attention is „new”. Recital (5) states that, following a call for proposals published on 2 September 2025 and closed on 5 February 2026, three new cross-border projects were selected, and recital (8) states that one project already on the list is being withdrawn, because its implementation will not continue in the current cross-border configuration, owing to significant challenges and uncertainties. Neither recital names any project. The published text contains only the consolidated list, in which the new entries look exactly like the old ones. A reader who opens this regulation alone cannot tell which rows were added, and therefore cannot say whether the Romanian projects are new or not.

It can be established by comparison, though, and the result is clear. The list applicable up to and including 30 September 2026 came from Commission Delegated Regulation (EU) 2025/2514 of 29 July 2025, applicable from 12 January 2026, and had 13 projects. On it, position 2023-6 already existed, with the same two developers and the same two countries. The new list shows three numbers that did not exist before, 2025-2, 2025-4 and 2025-5, while position 2023-9, the „PONTIS” project developed by Iberdrola Clientes SAU and Mitsubishi Corporation, with Spain and the Netherlands as participating countries, has disappeared. The arithmetic closes: 13 projects, minus one withdrawn, plus three new ones, make 15.

Of the two Romanian projects, therefore, only 2025-2 WIND is new. The Turnu Măgurele – Nikopol hydraulic structures complex joined the list through Commission Delegated Regulation (EU) 2024/2613 of 24 July 2024, published on 1 October 2024 and applicable from 21 October 2024, when the list held 8 projects. On 1 October 2026 it has been sitting there for 710 days. The 2026 regulation leaves its developers, its countries and its number untouched. In the English version it changes nothing at all about the entry: the name reads „TMNHSA – Turnu Magurele – Nikopol Hydraulic Structures Assembly”, word for word the same as in the two earlier versions of the list. One thing does change, and it changes silently, but only in the Romanian version of the regulation: the Romanian name of the project moves from „Complexul hidrotehnic Turnu Măgurele – Nicopole”, the form used in 2024 and in 2025, to „Complexul hidraulic Turnu Măgurele – Nicopole”. Number 2023-6 and the two developers stay the same, so identification of the project does not suffer, yet in Romanian the official name of a project on the list changed without a single recital mentioning it.

On technologies, the regulation says less than it seems to. Recital (5) shows that the assessment examined the implementation of the projects through different technologies, among them geothermal energy, onshore wind and solar photovoltaic, but it ties no technology to any project. The only pointer left is the name: project 2025-2 is called „Wind Integration for Network Decarbonization”, so wind energy sits at its centre. For the other two new entries, 2025-4 „DEPLOY”, developed by ENERTRAG SE in the German-Polish border region, and 2025-5 „ZEGA-LINNK”, developed by Geothermie-Wärmegesellschaft Braunau-Simbach mbH between Austria and Germany, the three technologies cannot be matched to the projects from the published text.

What it changes in practice

The first effect is the one the Commission itself writes down, in recital (4): inclusion in the list makes the projects eligible to apply for funding under the Connecting Europe Facility. The verb matters. The status opens the right to file an application, not the right to money. Article 7(3) of Regulation (EU) 2021/1153 declares eligible for funding studies aimed at developing and identifying cross-border projects, while paragraph (4) adds, for works, two further conditions that the status does not cover: the cost-benefit analysis of the project must provide evidence of cost savings or significant benefits for system integration, environmental sustainability, security of supply or innovation, and the applicant must demonstrate that the project would not materialise without the grant, or that it would not be commercially viable without it. A project may therefore sit on the list and receive not a single euro.

The second effect is the size of the envelope, and here the figures can be worked out. Article 4(1) of Regulation (EU) 2021/1153 sets the financial envelope of the Facility for 2021-2027 at EUR 33,710,000,000 in current prices. Paragraph (2), point (b) allocates EUR 5,838,000,000 to the energy sector, of which 15 %, subject to market uptake, go to cross-border projects in the field of renewable energy, and if the 15 % threshold is reached, the Commission raises it up to 20 %. That gives EUR 875,700,000 as the starting benchmark and at most EUR 1,167,600,000 as the ceiling. Divided among the 15 projects on the list, the starting benchmark works out at an average of EUR 58,380,000 per project, a figure the regulation does not write down and one that shows the real order of magnitude of the competition. Checked, the budget components add up: 25,807 plus 5,838 plus 2,065 million euro make exactly the 33,710 million of paragraph (1).

The third effect is that the envelope is not guaranteed. Article 7(7) of the same regulation provides that, where the market does not take up enough of the funds reserved for cross-border renewable energy projects, the unused part is moved to the objectives relating to trans-European energy networks and, from 2024, may co-finance the Union renewable energy financing mechanism set up by Article 33 of Regulation (EU) 2018/1999. In other words, if the projects on the list do not file good applications, the money does not sit around waiting for them.

The fourth effect concerns the Romanian-Ukrainian project directly, and it is the only one that touches the way Romania’s green energy target is measured. Article 7(1) of Regulation (EU) 2021/1153 requires a cross-border project to be covered by a cooperation agreement between two or more Member States, or between one or more Member States and one or more third countries, as provided for in Articles 8, 9, 11 and 13 of Directive (EU) 2018/2001. Of these four, Article 8 governs statistical transfers between Member States, Article 9 joint projects between Member States, Article 13 joint support schemes, and Article 11 is the only one covering joint projects between Member States and third countries. Ukraine is a third country, so the legal basis can only be Article 11, which deals exclusively with the production of electricity from renewable sources.

The conditions in Article 11(2) are the ones that turn a paper project into kilowatts that count. Electricity produced in the third country is taken into account towards the Member State’s renewable energy share only if it is consumed inside the Union, and that requirement is deemed met only when an equivalent amount has been firmly nominated to the allocated interconnection capacity by all responsible transmission system operators, in the country of origin, in the country of destination and in any transit countries, and has been firmly registered in the scheduled energy balance by the transmission system operator on the Union side of the interconnector. The installation must also have become operational after 25 June 2009, or have been refurbished after that date, the exported electricity must not have received support from the third country other than investment aid, and production must comply with international law, in a country that is party to the European Convention on Human Rights or to other human rights treaties. Ukraine is party to the Convention, so the last condition is met; the others are checked for every megawatt hour, through capacity allocation and nomination at Transelectrica, not through an entry on a list.

The fifth effect is oversight. The Expert Group for renewable energy cross-border projects, made up of one representative of each Member State and one of the Commission, has the task, under Part IV, point 4(h) of the Annex to Regulation (EU) 2021/1153, of monitoring the implementation of the projects on the final list and recommending how delays can be avoided, while promoters are required to send information on the progress of the works. Point (j) adds the lever: a project loses its status if the information that weighed decisively in the assessment proves incorrect, or if the project fails to comply with Union law. The withdrawal of the Spanish-Dutch project in this regulation is the first example of point (h) in use: the annual progress report identified the project, the group agreed, and the position vanished from the list.

What has changed compared with the previous situation

Up to and including 30 September 2026, the applicable list was the one set by Commission Delegated Regulation (EU) 2025/2514, with 13 projects, on which Romania appeared once. From 1 October 2026 the list holds 15 projects and Romania appears twice. In numbers, the only change that matters to a reader in Romania is the addition of position 2025-2, the project with Ukraine, since position 2023-6 passes untouched from one version to the next.

The geography of the list has changed too, in a direction worth reading off the figures. Of the 15 projects, 14 Member States appear at least once, which means 13 of the 27 appear nowhere. Germany is in 6 projects, that is in 40 % of the list. The three Baltic States, Estonia, Latvia and Lithuania, appear together in 5 projects, and the German-Polish border region in 3, all three concerning urban district heating or the decarbonisation of industry. The two groups together cover 8 of the 15 positions, more than half. There are three third countries: Algeria and Tunisia, in the Mediterranean MedGen project, and Ukraine, through the new project. In south-eastern Europe, the only Member States present remain Romania and Bulgaria, tied to the same hydropower project.

The third thing that has changed is the pace. The list must be reviewed, under Part IV, point 4(g) of the Annex to Regulation (EU) 2021/1153, as necessary and at least once every two years. The actual updates have come more often: the list was established on 29 August 2022 and amended on 19 September 2023, on 24 July 2024, on 29 July 2025 and now on 2 July 2026, that is at intervals of 386, 309, 370 and 338 days. The rhythm is effectively annual, and a developer who misses a round does not wait two years, but around one.

Advantages and disadvantages

What it improves

  • Romania now has two projects on the list instead of one, and the second opens a new direction, cooperation with Ukraine on renewable electricity generation, not only on interconnection and transit.
  • The status is a real gateway to funding, not an honorary title. Without it, a project cannot compete for the EUR 875.7 million reserved for this category in the Connecting Europe Facility, and the threshold can rise to 20 % of the energy sector.
  • For the hydropower project at Turnu Măgurele, continuity has a value of its own. Position 2023-6 goes through a third consecutive update without changes, which shows that the annual progress assessment raised no flags, while another project was removed by this very regulation.
  • The clean-up mechanism works. A project that can no longer be carried through in its cross-border configuration leaves the list following the annual report and the agreement of the expert group, so the envelope is not left tied up in dead positions.
  • The list is also published on the Commission’s website, under Part IV, point 4(g), so a developer or a local authority can check the status of a project without opening the Official Journal.
  • For the project with Ukraine, the condition in Article 11(2), point (d) of Directive (EU) 2018/2001 is already met, since Ukraine is party to the European Convention on Human Rights. What remains to be solved is the technical side, not eligibility in principle.

What remains a problem

  • The regulation names neither the projects added nor the one withdrawn, although the recitals speak of three entries and one exit. The only way to find out who is new is a manual comparison with the previous version of the list, which the reader has to go and find alone.
  • The list contains no figures at all. Estimated capacity, annual output, total cost and eligible cost are missing, even though Part IV, point 4(d) of the Annex to Regulation (EU) 2021/1153 requires exactly these data to be made available to the expert group. The information exists, but it does not reach the public.
  • At position 2025-2, the developers column holds a single word, „DTEK”, with no legal form, while every other private entry in the table is written out in full, from „S.P.E.E.H. HIDROELECTRICA S.A.” to „Geothermie-Wärmegesellschaft Braunau-Simbach mbH”. The entity carrying the project cannot be identified from the regulation.
  • Between the closing of the call for proposals, on 5 February 2026, and the entry into force of the list, on 1 October 2026, 238 days went by. A selected developer waited almost eight months before being able to invoke the status.
  • The geographical balance required by Part IV, point 4(i) remains a statement on paper. Thirteen Member States do not appear on the list, Germany appears in 40 % of the projects, and the south-eastern half of the Union is represented by a single project.
  • The status shortens nothing in the permitting process. Recital (7) says explicitly that inclusion in the list is subject to compliance with Union law, including the outcome of the environmental assessment and of the authorisation procedures, so a project can be on the list and stuck in permits at the same time.

Practical advice

  1. If you are following a particular project, remember the number, not the name. Numbers 2023-6 and 2025-2 have gone through the updates unchanged, whereas the Romanian name of the first moved from „hidrotehnic” to „hidraulic” with no explanation, while its English name stayed put.
  2. Do not mistake the status for the funding. Before announcing a project as EU-funded, check whether a grant has actually been awarded through a call for proposals under the Connecting Europe Facility. The list in Delegated Regulation (EU) 2022/2202 only shows who is entitled to compete.
  3. Developers who want to be on the list should prepare the cooperation agreement first. Without an agreement within the meaning of Articles 8, 9, 11 or 13 of Directive (EU) 2018/2001 between the participating States, the application fails the general criterion in Part IV, point 2(a) of the Annex to Regulation (EU) 2021/1153, however good the technical project may be.
  4. Prepare the cost-benefit analysis from the start, not at the end. The Annex to Regulation (EU) 2021/1153 lists, in Part IV, point 3, seven mandatory components, from generation and system integration costs through to emissions, security of supply, local pollution and innovation, and Article 7(4) turns it into a condition of eligibility for works.
  5. For a project with a third country, plan the interconnection capacity early. Article 11(2), point (a) of Directive (EU) 2018/2001 requires firm nomination of the allocated capacity and registration in the scheduled balance by the transmission system operator on the Union side, so the grid side cannot be left until last.
  6. Follow the calendar of the calls for proposals, not just that of the list. The Commission is required, by Part IV, point 4(a), to give promoters the possibility of requesting the status at least once a year, and the round that produced the new projects stayed open for 156 days, from 2 September 2025 to 5 February 2026.
  7. If you already hold the status, treat reporting as an obligation, not a formality. Point (h) of Part IV, point 4 requires promoters to send information on implementation, and point (j) allows the status to be withdrawn for incorrect information or for failure to comply with Union law.

Frequently asked questions

Are both Romanian projects new?
No. Only project 2025-2, „Wind Integration for Network Decarbonization – WIND”, with Romania and Ukraine, joins the list now. Project 2023-6, the Turnu Măgurele – Nikopol hydraulic structures complex, has been on the list since 21 October 2024, when it was added by Delegated Regulation (EU) 2024/2613. The 2026 regulation changes neither its number, nor its developers, nor its participating countries.
How can anyone tell which projects are new, if the regulation does not name them?
By comparison with the previous list. The version applicable until 30 September 2026 came from Delegated Regulation (EU) 2025/2514 and had 13 projects. The new list shows three numbers that did not exist before, 2025-2, 2025-4 and 2025-5, while position 2023-9, the „PONTIS” project of Spain and the Netherlands, is missing. Those 13 positions, minus one withdrawn, plus three new ones, give the 15 of today.
What does a project on the list actually get?
The right to apply for European funding through the Connecting Europe Facility, for studies as well as for works. For works, Article 7(4) of Regulation (EU) 2021/1153 adds two conditions: the cost-benefit analysis must show savings or significant benefits, and the applicant must prove that the project would not go ahead, or would not be commercially viable, without the grant.
How big is the money that can be reached?
The energy sector of the Facility holds EUR 5,838,000,000 for 2021-2027, of which 15 % are reserved for this category of projects, subject to market uptake, that is EUR 875,700,000. If the threshold is reached, the Commission raises it up to 20 %, so up to EUR 1,167,600,000. Spread over the 15 projects on the list, the starting benchmark gives an average of EUR 58,380,000, though the money is handed out through competition, not in quotas.
Does the regulation say what capacity the project with Ukraine has?
No. The table has four columns, the number, the name, the developers and the countries, and none of them holds technical or financial figures. Estimated capacity in kilowatts, annual output, total cost and eligible cost are data that Part IV, point 4(d) of the Annex to Regulation (EU) 2021/1153 requires for the expert group, not for the published text.
Does electricity produced in Ukraine count towards Romania’s green energy target?
Only if the conditions of Article 11(2) of Directive (EU) 2018/2001 are met. The hardest is the first: the electricity must be consumed in the Union, and the proof consists in the firm nomination of an equivalent amount to the interconnection capacity allocated by all the transmission system operators involved, and in its registration in the scheduled energy balance on the Union side. Simply appearing on the list does not produce that effect.
Why does Luxembourg turn up in offshore wind projects?
Because „cross-border” here means a legal link, not a cable. Luxembourg, which is landlocked, appears in two projects, the Saare-Liivi offshore wind park, together with Estonia, and the CORES studies, together with Portugal. The cooperation mechanisms in Articles 8 and 9 of Directive (EU) 2018/2001, the statistical transfer and the joint project, do not require geographical proximity.
How often is the list updated?
Part IV, point 4(g) of the Annex to Regulation (EU) 2021/1153 requires a review at least once every two years. In practice the updates came on 19 September 2023, 24 July 2024, 29 July 2025 and 2 July 2026, that is 386, 309, 370 and 338 days apart, roughly once a year.

Editorial analysis

The regulation solves a real administrative problem, keeping up to date a list that decides access to a European envelope, and it solves it with economy of means: a single substantive article, which replaces Article 1 of the basic regulation with the complete list. The trouble is that the economy of means is paid for by the reader. Two recitals announce three entries and one exit, and neither says which they are. The published text carries no mark of novelty: positions 2025-2, 2025-4 and 2025-5 are printed exactly like the positions from 2022. To find out that the Romanian project at Turnu Măgurele has been on the list for 710 days, while the one with Ukraine is new, you have to open three acts, Delegated Regulation (EU) 2024/2613, Delegated Regulation (EU) 2025/2514 and this one, and compare 13 rows with 15. A delegated act that hides its own subject matter breaks no drafting rule, but it shifts the cost of reading onto the addressee.

The second observation comes from putting the list next to the budget, and it shows that the status is worth less than it sounds. The energy sector of the Connecting Europe Facility holds EUR 5,838,000,000, of which 15 % for this category, so EUR 875,700,000. Divided by 15 projects, that gives an average of EUR 58,380,000, for a horizon that ends on 31 December 2027, that is 456 days after the list enters into force. A hydraulic complex on the Danube is not financed out of EUR 58 million, and Article 7(7) allows the part not taken up to be moved to the trans-European energy networks. Within this financial frame, the list is above all an admission ticket to a competition, and the competition is short and small compared with the objects that figure on it.

The third observation concerns the geographical balance, which Part IV, point 4(i) of the Annex to Regulation (EU) 2021/1153 places on the Commission. Counted on the published table, it does not exist. Thirteen of the 27 Member States appear in no position at all. Germany appears in 6 of the 15 projects, and three of them lie in the same corridor, the German-Polish border, with district heating at Görlitz and Zgorzelec, district heating at Słubice and Frankfurt (Oder) and the decarbonisation of industrial clusters in the same region. The Baltic States add 5 projects. The two concentrations make 8 of the 15. The south-east of the Union has a single project, the Bulgarian-Romanian one, to which Romania now adds the project with Ukraine. The gentlest reading is that the list reflects where the administrative capacity to prepare cross-border files already exists, not where decarbonisation is needed. That reading does not follow from the regulation, but it does follow from counting its rows.

The fourth observation concerns the only entry that matters for Romania, and the way it is written. Project 2025-2 has, in the developers column, a single word: DTEK. Every other private entry in the table carries the full name, with the legal form, from „Natsionalna Elektricheska Kompania EAD” and „S.P.E.E.H. HIDROELECTRICA S.A.” through to „Geothermie-Wärmegesellschaft Braunau-Simbach mbH” and „ENERTRAG SE”, while the MedGen project goes as far as stating the role of each company, coordinator or promoter. For the project with Ukraine, the regulation names a group, not a legal person. This is not a contradiction, since the status attaches to the project, identified by number and name, not to the developer. It is, however, an asymmetry that leaves the simplest question unanswered on Romania’s newest project: who is carrying it.

What should be changed

  • Marking the new entries and the withdrawn one in the text of the act itself. A column showing the act through which each project joined the list, or at least a list of the numbers added and of the one withdrawn in recitals (5) and (8), would make manual comparison with two earlier regulations unnecessary and would close off the predictable error, presenting a two-year-old project as a novelty.
  • Publishing the data that the expert group receives anyway. Part IV, point 4(d) of the Annex to Regulation (EU) 2021/1153 requires the estimated capacity, the annual output, the total cost and the eligible cost. Two extra columns in the table would give the public, local authorities and the press the minimum basis for an assessment, without touching commercially sensitive information, which the same point already exempts.
  • The full name of the developer, with its legal form, for every position. „DTEK” does not identify a legal person, and for the projects run by ministries the State is not stated either, even though „Bornholm Energy Island” lists two countries. A single drafting rule for the column would remove the difference in treatment between positions.
  • Fixing the Romanian name of the projects and correcting the silent change. Project 2023-6 was called „Complexul hidrotehnic Turnu Măgurele – Nicopole” in 2024 and 2025, and now „Complexul hidraulic Turnu Măgurele – Nicopole”, while the English name stayed the same throughout. Either the established form is restored, or the new one is owned through a corrigendum, so that following a project through the paperwork does not depend on which language version you open.
  • A time limit between the closing of the call for proposals and the entry into force of the list. Between 5 February 2026 and 1 October 2026, 238 days went by, of which 71 between the adoption of the act, on 2 July 2026, and its publication, on 11 September 2026, that is more than the 20-day vacatio legis the act imposes on itself. A publication deadline would shorten the wait for developers who have already been selected.
  • An express reference to the cooperation mechanism applicable to each project. A project with a third country can only rest on Article 11 of Directive (EU) 2018/2001, with all its conditions on consumption in the Union, whereas a project between Member States may rest on Article 8, 9 or 13, with completely different consequences. Stating the article in the table would show the reader at a glance what has to happen physically for the project to count towards a Member State’s target.

Original text of the legal act

The text below is reproduced in Romanian, the official form of publication.

Show the full legal textHide the full legal text

REGULAMENTUL DELEGAT (UE) 2026/1470 AL COMISIEI din 2 iulie 2026 de modificare a Regulamentului delegat (UE) 2022/2202 prin actualizarea listei de proiecte transfrontaliere selecționate în domeniul energiei din surse regenerabile (Text cu relevanță pentru SEE)

EMITENT: Comisia Europeană

Publicat în: Jurnalul Oficial al Uniunii Europene, seria L, 2026/1470 din 11 septembrie 2026

COMISIA EUROPEANĂ,

având în vedere Tratatul privind funcționarea Uniunii Europene,

având în vedere Regulamentul (UE) 2021/1153 al Parlamentului European și al Consiliului din 7 iulie 2021 de instituire a Mecanismului pentru interconectarea Europei și de abrogare a Regulamentelor (UE) nr. 1316/2013 și (UE) nr. 283/2014 (1), în special articolul 25 alineatul (1) litera (b),

întrucât:

(1) Regulamentul (UE) 2021/1153 stabilește o categorie de proiecte transfrontaliere în domeniul energiei din surse regenerabile care contribuie la decarbonizare, la finalizarea pieței interne a energiei și la îmbunătățirea securității aprovizionării cu energie. În temeiul articolului 7 alineatul (1) din Regulamentul (UE) 2021/1153, proiectele transfrontaliere respective sunt instituite printr-un acord de cooperare între două sau mai multe state membre sau între unul sau mai multe state membre și una sau mai multe țări terțe, astfel cum se prevede la articolele 8, 9, 11 și 13 din Directiva (UE) 2018/2001 a Parlamentului European și a Consiliului (2).

(2) Selecționarea proiectelor transfrontaliere în domeniul energiei din surse regenerabile face obiectul criteriilor și procedurilor generale prevăzute în Regulamentul (UE) 2021/1153 și al unor criterii de selecție specifice și detalii suplimentare ale procesului de selecție prevăzute în Regulamentul delegat (UE) 2022/342 al Comisiei (3).

(3) Proiectele transfrontaliere în domeniul energiei din surse regenerabile sunt selecționate și incluse pe o listă elaborată în acest scop prin intermediul actelor delegate.

(4) Includerea pe listă a proiectelor transfrontaliere în domeniul energiei regenerabile le face eligibile pentru solicitarea de finanțare în cadrul Mecanismului pentru interconectarea Europei.

(5) În urma unei cereri de propuneri publicate la 2 septembrie 2025 și încheiate la 5 februarie 2026, au fost selecționate trei noi proiecte transfrontaliere în domeniul energiei din surse regenerabile. Proiectele selecționate au fost evaluate de experți externi și de experți din cadrul Agenției Executive Europene pentru Climă, Infrastructură și Mediu și al Comisiei Europene. Evaluarea a examinat în special exploatarea eficientă din punctul de vedere al costurilor a energiei din surse regenerabile și punerea în aplicare a proiectelor prin diferite tehnologii din domeniul energiei din surse regenerabile, inclusiv energia geotermică, energia eoliană onshore și energia solară fotovoltaică.

(6) Comisia a notificat rezultatele evaluării referitoare la noile proiecte transfrontaliere selecționate în domeniul energiei din surse regenerabile Grupului de experți pentru proiecte transfrontaliere în domeniul energiei din surse regenerabile (4) (denumit în continuare „grupul de experți”). În urma acordului grupului de experți, noile proiecte transfrontaliere selecționate în domeniul energiei din surse regenerabile trebuie incluse pe listă.

(7) Includerea proiectelor pe lista proiectelor transfrontaliere în domeniul energiei din surse regenerabile face obiectul conformității acestora cu legislația Uniunii, inclusiv cu rezultatul evaluării de mediu și al procedurilor de autorizare relevante.

(8) În scopul punerii în aplicare a părții IV punctul 4 litera (h) din anexa la Regulamentul (UE) 2021/1153, Comisia a prezentat grupului de experți raportul anual privind progresele înregistrate în ceea ce privește proiectele aflate deja pe lista proiectelor transfrontaliere în domeniul energiei din surse regenerabile. Raportul privind progresele înregistrate a identificat un proiect a cărui punere în aplicare nu va continua în configurația sa transfrontalieră actuală din cauza unor dificultăți și incertitudini semnificative. În urma acordului grupului, respectivul proiect transfrontalier în domeniul energiei din surse regenerabile trebuie retras de pe listă.

(9) Prin urmare, Regulamentul delegat (UE) 2022/2202 al Comisiei (5) trebuie modificat în consecință,

ADOPTĂ PREZENTUL REGULAMENT:

Articolul 1

Articolul 1 din Regulamentul delegat (UE) 2022/2202 se înlocuiește cu următorul text:

„Articolul 1

Lista proiectelor transfrontaliere în domeniul energiei din surse regenerabile selecționate în temeiul părții IV punctul 4 litera (g) din anexa la Regulamentul (UE) 2021/1153 este următoarea:

Numărul proiectului Denumirea proiectului Dezvoltatorii proiectului Țările participante
2022-05 ELWIND – Proiect comun și hibrid de energie eoliană offshore între Estonia și Letonia Ministerul Afacerilor Economice și Comunicațiilor din Estonia; Ministerul Economiei Republicii Letonia Estonia și Letonia
2022-07 CICERONE – CEO-Alianța pentru un lanț valoric european și transfrontalier al hidrogenului verde Essent Hydrogen B.V.; IBERDROLA CLIENTES S.A.U. Germania, Țările de Jos și Spania
2022-10 UNITED HEAT – Termoficare urbană neutră din punctul de vedere al schimbărilor climatice în orașul european Goerlitz Zgorzelec Stadtwerke Görlitz AG; SEC Zgorzelec Sp. z o.o. Germania și Polonia
2023-2 ULP-RES WP – Parcul eolian Utilitas Lode-Penuja RES Utilitas Wind SIA; Utilitas Wind OÜ Estonia și Letonia
2023-3 SLOWP – Parcul eolian offshore Saare-Liivi Utilitas Wind OÜ Estonia și Luxemburg
2023-6 TMNHSA – Complexul hidraulic Turnu Măgurele – Nicopole Natsionalna Elektricheska Kompania EAD; S.P.E.E.H. HIDROELECTRICA S.A. Bulgaria și România
2023-7 BEI – Insula energetică Bornholm Ministerul Climei, Energiei și Utilităților Publice Danemarca și Germania
2024-1 CORES – Studii cuprinzătoare privind potențialul energiei din surse regenerabile offshore DGEG – Direção Geral de Energia e Geologia Luxemburg și Portugalia
2024-2 Generare de energie din surse regenerabile Medlink – MedGen Zhero Europe B.V: entitate juridică privată într-un stat membru (NL – coordonator) Medlinks Algeria B.V.: entitate juridică privată într-un stat membru (NL – promotor) Medlinks Tunisia B.V: entitate juridică privată într-un stat membru (NL – promotor) Algeria, Italia și Tunisia
2024-3 Parcul eolian Utilitas Eleja-Joniski – UELJO WP Utilitas Wind SIA; Utilitas Wind UAB Letonia și Lituania
2024-4 Parcul eolian offshore LiiviBay Enefit Green AS Estonia și Letonia
2024-6 Transformarea ecologică a încălzirii centralizate în orașele înfrățite Słubice și Frankfurt (Oder) – Twin Heat SEC Region Sp. z o.o și Stadtwerke Frankfurt (Oder) GmbH Germania și Polonia
2025-2 Integrarea energiei eoliene pentru decarbonizarea rețelei – WIND DTEK România și Ucraina
2025-4 Decarbonizarea clusterelor industriale din regiunea de frontieră germano-poloneză prin instalarea unei centrale electrice transfrontaliere integrate – DEPLOY ENERTRAG SE Germania și Polonia
2025-5 Rețea de termoficare cu emisii zero care leagă Germania și Austria – ZEGA-LINNK Geothermie-Wärmegesellschaft Braunau-Simbach mbH Austria și Germania”

Articolul 2

Prezentul regulament intră în vigoare în a douăzecea zi de la data publicării în Jurnalul Oficial al Uniunii Europene.

Prezentul regulament este obligatoriu în toate elementele sale și se aplică direct în toate statele membre.

Adoptat la Bruxelles, 2 iulie 2026.

Pentru Comisie

Președinta

Ursula VON DER LEYEN

(1) JO L 249, 14.7.2021, p. 38, ELI: http://data.europa.eu/eli/reg/2021/1153/oj.

(2) Directiva (UE) 2018/2001 a Parlamentului European și a Consiliului din 11 decembrie 2018 privind promovarea utilizării energiei din surse regenerabile (JO L 328, 21.12.2018, p. 82, ELI: http://data.europa.eu/eli/dir/2018/2001/oj).

(3) Regulamentul delegat (UE) 2022/342 al Comisiei din 21 decembrie 2021 de completare a Regulamentului (UE) 2021/1153 al Parlamentului European și al Consiliului în ceea ce privește criteriile de selecție specifice și detaliile procesului de selecție a proiectelor transfrontaliere în domeniul energiei din surse regenerabile (JO L 62, 1.3.2022, p. 1, ELI: http://data.europa.eu/eli/reg_del/2022/342/oj).

(4) Menționat în partea IV punctul 4 litera (b) din anexa la Regulamentul (UE) 2021/1153 și specificat în detaliu în Regulamentul delegat (UE) 2022/342.

(5) Regulamentul delegat (UE) 2022/2202 al Comisiei din 29 august 2022 de completare a Regulamentului (UE) 2021/1153 al Parlamentului European și al Consiliului prin stabilirea unei liste de proiecte transfrontaliere selecționate în domeniul energiei din surse regenerabile (JO L 293, 14.11.2022, p. 1, ELI: http://data.europa.eu/eli/reg_del/2022/2202/oj).

Sursă: Jurnalul Oficial al Uniunii Europene, seria L, 2026/1470 din 11 septembrie 2026.

This article is for informational purposes only and does not constitute legal advice. For specific situations, consult a licensed attorney or tax advisor.